S.S.38 highway - Morbegno by-pass (year:2008)

Detailed design of a new 9.3 km double carriageway highway, which is the alternate route to the National Road S.S.38 "dello Stelvio". The new infrastructure aims to reduce local traffic and to improve the surrounding network through a better quality and safer road.

The double carriageway is composed by two lines per direction of 3.75 m width each, 1.75 m width of right shoulder, 1 m width of left shoulder and 3 m width of traffic island: the section is 23.50 m width.

The project comprehends:


Client:

Impresa Claudio Salini S.p.A - Morbegno Scarl

JV:

3TI Progetti Italia and IGEAM srl

Total Amount of works:

144.446.368 Euros